Raiders Installed New Draft Room Video Wall
The Intermountain Health Performance Center now features an 83-foot wraparound display.
Updated on Oct. 6, 2026 in Football

Live Poll
Do you believe high-tech upgrades for professional sports teams are worth the investment?
The Raiders recently upgraded their draft room at the Intermountain Health Performance Center with a new, continuous video wall designed to assist staff during critical personnel decisions. The installation, completed by SNA Displays and Image Engineering, wraps around the room to provide a unified workspace.
Why it matters
The massive, high-resolution screen allows team staff to monitor live feeds, player analytics, and organizational branding simultaneously on a single, seamless surface. This technology aims to streamline the coordination of complex data during the rapid pace of the NFL draft.
The new system utilizes five 0.9mm pixel pitch LED panels totaling 15.2 million pixels across a display that stands 6 feet, 8 inches high. These figures represent a significant increase in resolution and workspace width compared to typical office-based video setups.
The players
Las Vegas Raiders
The professional football team that operates its headquarters and draft room out of the Intermountain Health Performance Center.
SNA Displays
The firm that provided installation supervision for the new high-resolution video wall technology.
Image Engineering
The integration and design firm responsible for executing the display system layout.
The details
The system utilizes MCOB LED technology to create a 2,160 x 26,880 pixel canvas that wraps around the draft room tables. Image Engineering managed the design and integration, while SNA Displays provided on-site supervision to ensure the five sections form a seamless image without visible breaks. The setup enables Raiders staff to synthesize branding and analytics on one surface during high-stakes personnel decisions.
Timeline
October 6, 2026: The installation project was publicly detailed.
Beyond the Strip
This installation utilizes MCOB LED technology, which has increasingly become the standard for high-density, interior visual displays. It marks a transition from standard monitor banks to the continuous, large-scale canvases now favored in corporate and athletic operational hubs.
While the technology is used for private draft operations, the installation highlights the ongoing growth of high-tech facilities within the Intermountain Health Performance Center. Residents should watch for further technological upgrades as the Raiders continue to modernize their local athletic headquarters.
The takeaway
The installation provides the Raiders staff with a significantly enhanced, unified display for managing draft analytics. Fans and residents interested in the team's facility development should monitor upcoming organizational announcements regarding the Intermountain Health Performance Center.
Further reading
For more on the team's operations, visit the Football section.
Live Poll
Do you believe high-tech upgrades for professional sports teams are worth the investment?




